This page is for the investor, plant manager or purchasing officer in Ghana or Nigeria who has chosen a plant and now has to get it into the country, and then sell what it makes. Delays at this stage rarely come from the machines. They come from a document nobody asked for in time, a standards check that should have happened before shipment, or a product that cannot be sold until it is registered.
Kadali Africa Ventures has offices in Accra and Kano, and the import and registration steps are discussed with the technical proposal so they are planned rather than discovered at the port. Who prepares and files each document, whether the importer, a licensed clearing agent or the supplier, is agreed for each project. This page summarises public government guidance; it is not legal or customs advice, and it does not state that any equipment is registered or certified in either country.
What This Service Delivers
- Equipment import and product registration planned as two separate tracks
- The regulators in Ghana and Nigeria named in one place
- Shipping documents agreed before dispatch, not corrected at the port
- First spares planned into the same shipment
- Enquiries followed up from Kadali's offices in Accra and Kano
1Two Separate Tracks to Plan Early
Buyers often plan only the first of these. The second decides when the plant can earn money.
- Getting the equipment in: Customs declaration, duties, standards conformity and inspection of the machines themselves, at the port of entry.
- Getting the product to market: Registration of the food, herbal, cosmetic or other regulated product the plant will make, and inspection of the factory that makes it. This shapes the factory layout, so it belongs in the planning before the layout is fixed.
2Bringing Equipment into Nigeria
Points that commonly affect timing and cost:
- Inspection on arrival: Nigeria moved from inspection before shipment to inspection at the destination, so every consignment is inspected when it arrives. Allow time for this before booking the installation team.
- Online customs documents: The Nigeria Customs Service uses the Pre-Arrival Assessment Report (PAAR) and the Single Window portal for submitting documents.
- SONCAP: The Standards Organisation of Nigeria's conformity assessment programme checks goods before shipment against the applicable Nigerian Industrial Standards or approved equivalents. Ask early whether any item in your order falls under it, because the check takes place before the goods leave.
- Duties and insurance: Duties follow the ECOWAS Common External Tariff, are either specific or ad valorem on the CIF value depending on the item, and are paid in naira on entry. Imported goods must be insured with an insurance company registered in Nigeria.
3Bringing Equipment into Ghana
Public guidance lists the import sequence in this order:
- Register the business: A registration certificate from the Registrar General's Department.
- Declare the import: An Import Declaration Form through the Ministry of Trade.
- Register as an importer where required: With the Food and Drugs Authority for regulated food, cosmetic and drug products, with the Plant Protection and Regulatory Services Directorate for agricultural products, or with the Ghana Standards Authority for other regulated products.
- Clear through ICUMS: A Tax Clearance Certificate from the Ghana Revenue Authority, then the Bill of Entry and the Customs Declaration through the ICUMS system.
- Inspection and release: Inspection where required by the Ghana Standards Authority, the Food and Drugs Authority or the plant protection service and by Customs, payment of charges, and release at the port.
4The Product Your Plant Will Make
In Nigeria, NAFDAC regulates the import, export, manufacture, advertisement, distribution, sale and use of food, drugs, cosmetics, medical devices, bottled water and chemicals, and may inspect production sites. In Ghana, regulated food, cosmetic and drug products come under the Food and Drugs Authority. A juice, oil, butter, flour or extract made in a new plant is therefore likely to need registration before it is sold, and the factory may be inspected.
Confirm the requirements with the regulator before the plant layout, hygiene zones and water supply are fixed, because changes are cheapest on paper. NAFDAC publishes a list of consultants who assist firms with its requirements.
5Documents Worth Agreeing With the Supplier Before Dispatch
Clearing agents commonly ask for the following. Agreeing the format before the goods ship avoids corrections at the port:
- Commercial invoice and packing list: Each package with its contents, weight and dimensions, matching the invoice.
- Item descriptions for classification: Clear descriptions of each machine so the tariff classification and any standards check can be settled early.
- Transport documents: Bill of lading or air waybill, and the insurance arrangement required at destination.
- Technical data: Data sheets and drawings that a standards body or clearing agent may ask for.
- Spares shipped with the plant: A recommended spares list, so the first spares travel in the same shipment rather than a second clearance.
Frequently Asked Questions
Does Kadali clear the equipment through customs for us?+
Is the equipment already SONCAP-certified or registered in Ghana?+
Does our product need NAFDAC or Food and Drugs Authority registration?+
How long does clearance take?+
Which ports are used?+
Related Product Categories
Related Products
Enquire About Import & Regulatory Planning
Tell Kadali Africa Ventures about your raw material, target product and capacity, and the technical proposal will set out the scope for your project.
